JEXPCB is the PCB and PCBA services brand of Shenzhen Yule Technology Co., Ltd. We coordinate PCB fabrication, component sourcing and assembly for international OEMs and electronics companies, from DFM review and prototypes to volume production.
We agree build specifications, material changes and inspection requirements before production.
Contact Us
Our production sites
Shenzhen · Shiyan
2,800 m²Rapid prototypes & small-batch PCBA
- SMT lines
- 8
- DIP lines
- 5
2 Assembly & packing lines
AOI, X-ray inspection and functional testing
Dongguan
5,500 m²High-volume PCBA production
- SMT lines
- 12
- DIP lines
- 6
6 Test lines
4 Assembly & packing lines


Why JEXPCB?
Clearer decisions. Better-coordinated electronics projects.
Clarify technical questions before production
Using engineering feedback from manufacturing partners, we review PCB files, BOMs and assembly requirements early. Materials, processes and manufacturability questions are clarified to reduce avoidable back-and-forth and rework risks.
Coordinate PCB, components and assembly
We coordinate board fabrication, component sourcing and assembly within one project workflow, helping align file revisions, material readiness and production plans while reducing the number of separate interfaces you manage.
Consider today’s costs and future production
Material and component options are assessed with sourcing feasibility, lead time and future volume needs in mind. We explain the differences and trade-offs of proposed alternatives and proceed after customer approval.
Make quality requirements specific
Inspection items, test scope and acceptance requirements are clarified before production. Relevant records and reports can be coordinated according to the project, giving both sides a clear basis for reviewing the delivery.
Follow key milestones and coordinate solutions
From technical approval to production and shipment, we follow key milestones. When shortages, technical questions or schedule changes arise, we help clarify the impact, discuss practical options and move the next action forward.
Manufacturing certifications
The certificates below identify the holder and applicable site. We confirm the certification scope and inspection requirements for each project.
Quality Management
Documented controls that support consistent PCBA development and assembly.
Environmental Management
Structured environmental controls and continual improvement across operations.
Occupational Health & Safety
Systematic safeguards that support safe, resilient and consistent production.
Click any certificate to view the full-size document.
Global Compliance Support
CE, FCC, UL & RoHS Preparation and Testing Support
Our engineering team can coordinate compliance preparation and third-party testing support for CE, FCC, UL and RoHS requirements. By identifying documentation and testing risks early, we help reduce rework, shorten approval cycles and simplify your path to target markets.
