What Files Are Required for a PCB Assembly Quotation?

AI-generated production illustration

PCB Assembly / Practical purchasing guide

A useful PCB assembly quotation starts with three complementary datasets: the board manufacturing files, a bill of materials and component placement data. The quantity, supply model and inspection scope then explain what work the quote must cover.

Have an incomplete file pack?

You can start a JEXPCB enquiry with the information available. Missing data should be identified during review; final pricing and production release depend on confirming the complete build requirements.

GerberBOMCPL / XYBoard geometry & layersExact parts & quantitiesPosition, rotation & side
A coordinated quotation package describes the board, the components and their placement. All files should identify the same board revision.

1. The core file set

File or informationUseful contentsWhy it matters
Gerber manufacturing packageCopper, solder mask, legend and paste layers where relevant; board outline and drill data; revision and layer order.Defines the PCB to manufacture and the board used by the assembly process.
BOM, preferably XLSX or CSVManufacturer, exact manufacturer part number, package, quantity per board and reference designators; DNP and approved alternatives identified.Supports component identification, sourcing and material cost review.
CPL / centroid / pick-and-place fileReference designator, X/Y position, rotation and top/bottom side, with coordinate units and origin clearly stated.Describes where components belong and how placement data should be interpreted.
Assembly drawing and build notesPolarity, pin-one orientation, connector direction, special mechanical steps and variant-specific instructions.Explains requirements that a part list or coordinate file cannot fully communicate.

Gerber data alone does not replace the component information in a BOM or placement file. Keep the drill data, outline and layer information together with the fabrication export, and use a clear revision in the file names.

2. Check the BOM against placement data

Use the exact purchasing part number, including suffixes that affect package, rating or temperature grade. A generic value such as “10 kΩ resistor” leaves purchasing decisions unresolved. Identify whether alternatives are permitted and who approves them.

Reference designators should agree between the BOM, placement export and assembly drawing. Check for duplicate references, quantity mismatches, omitted parts and inconsistent capitalisation. Mark do-not-populate positions explicitly so an intentionally empty footprint is distinguishable from a missing BOM entry.

A typical placement header could be:

Designator, X_mm, Y_mm, Rotation_deg, Side

This is an example heading, not a universal machine format. Confirm the origin, units, rotation convention and bottom-side interpretation with the assembler. Export from the current CAD revision and review the assembly preview or first article instead of assuming all CAD tools express orientation identically.

3. Define what the quotation covers

  • Quantity and schedule: separate engineering prototypes, the first article or pilot build, and the planned production quantity.
  • Material responsibility: state turnkey sourcing, customer-supplied parts or a mixed model. Identify supplied bare boards and any expected component shortages.
  • PCB specification: state material, thickness, copper weight, finish, stack-up or impedance requirements when applicable; indicate panelisation needs.
  • Programming and testing: provide firmware, programming instructions, functional-test steps, limits and fixture or connector details when available. Inspection and electrical/functional testing are different activities and their scope should be agreed.
  • Delivery condition: identify coating, cleaning, traceability, labels, packaging and box-build requirements relevant to the product.

Also state any required acceptance standard and revision, without assuming that every project needs the same class or test method. These choices can affect labour, fixtures, procurement and lead time.

4. Move from review to a controlled build

For a preliminary discussion, a partial Gerber package, early BOM, CAD exports or clear board photographs may be useful. List the missing items rather than guessing values. A confirmed manufacturing package must resolve those gaps before production.

JEXPCB’s published workflow includes PCB production-file approval before fabrication and first article approval before mass assembly. Use those checkpoints to confirm the board revision, part choices, assembly orientation and agreed test plan. A clear release package reduces avoidable clarification cycles and helps purchasing compare quotations on the same scope.

For the available service scope, see PCB assembly, PCB fabrication and component sourcing.

Technical references

References checked 25 October 2026. File conventions and manufacturing scope must be agreed with the chosen supplier; examples here are not machine setup instructions.

Start with the files you have.

Share your current Gerber, BOM or available project information. Tell us what is missing and which requirements matter to your build.

Request a Quote