JEXPCB / Engineering knowledge
Knowledge Center
Clear answers for better builds. Practical guidance on PCB manufacturing, assembly, component sourcing and engineering decisions—from the first file review to production release.
Featured Articles
Start with these practical guides for your next PCB or PCBA project.

What Files Are Required for a PCB Assembly Quotation?
Prepare a consistent Gerber, BOM and placement package, define the assembly scope and learn how to start with incomplete files.

ENIG vs HASL: How to Choose the Right PCB Surface Finish
Compare planarity, assembly requirements, cost and lead-free specifications before choosing ENIG or HASL for a PCB.
Latest Articles
New technical guidance, automatically added when an article is published.

Should Prototype and Mass-Production PCBs Use the Same Supplier?
When one PCB supplier should support prototype and volume, and when a controlled transfer or dual-source strategy is safer.

MOQ, MOV and NCNR: Hidden Material Liabilities in Turnkey PCBA
Understand how MOQ, MOV, NCNR and leftover-material ownership change the real cost and risk of a turnkey PCBA quotation.

IPC Class 2 vs Class 3: What Actually Changes for PCB and PCBA?
A practical comparison of IPC Class 2 and Class 3 covering acceptance, documentation, process control, inspection and cost.

PCB Creepage and Clearance: What Changes at High Voltage?
How voltage, pollution degree, material group, altitude, slots and coating change creepage and clearance decisions on high-voltage PCBs.

BGA and QFN Voiding: What X-Ray Results Actually Mean
How to interpret BGA and QFN X-ray voiding without relying on a misleading universal percentage, and how to define a production acceptance plan.

HDI Microvias: Stacked vs Staggered Vias and Sequential Lamination
A practical HDI guide to stacked and staggered microvias, sequential lamination, reliability trade-offs and production-release data.
Have a project in mind?
Share the files you have and the requirements you know. We can clarify the remaining information during review.
